Construction of Disneyland's Fantasmic!
Page 4

Testing the MeeFog system.

The river was partially filled to allow for early testing of the pumps and other water-related systems.

Shortly after, the river was completely filled for the first time in months.

It looked great!

River traffic did not reopen yet as this was still a construction zone.

Oops!  A problem with the gas lines resulted in a complete draining.

In this picture, you can see each of the light/fountain platforms.

Staining of the cider mill has begun, and rock work is almost complete.

The center fountain platform is in the show-ready position, and the Pinocchio puppets are up.

If you look closely, you can see that the fountains on the right are undergoing testing. 

At this point in the construction process, some river traffic had reopened.  This shot from the Mark Twain shows the detail of the original fountain platforms.